AIR Division – Heathrow Terminal 3
TONE Scaffolding were contracted to supply a vast access and support scaffold for a project at Heathrow Terminal 3 to extend the terminal. Using System Scaffolding, TONE operatives erected the
TONE Scaffolding were contracted to supply a vast access and support scaffold for a project at Heathrow Terminal 3 to extend the terminal. Using System Scaffolding, TONE operatives erected the
TONE Scaffolding were contracted to supply a temporary staircase at Heathrow Terminal 1 whilst refurbishment works were being carried out. The staircase allowed the public to access the next floor
TONE Scaffolding were contracted to supply scaffolding to assist in the Gatwick Pier 5 Reconfiguration Project, turning Pier 5 in the North terminal from one storey to two storeys. The
TONE Scaffolding provided a protection scaffold for a project at Gatwick Airport. TONE erected the scaffold and clad it in Protect Panels to ensure that the demolition works that were
When the Gatwick Immigration Hall ceiling became contaminated with asbestos, TONE Scaffolding were contracted to supply a sealed working platform below the ceiling for removal and replacement works. TONE clad