•  
  • 020 3781 7771

  •  

AIR Division – Gatwick Pier 5

TONE Scaffolding were contracted to supply scaffolding to assist in the Gatwick Pier 5 Reconfiguration Project, turning Pier 5 in the North terminal from one storey to two storeys. The scaffolds were required for loading gantries for access of materials at high levels, Birdcage scaffolds over the escalators for ceiling installation, independent access scaffolds for fire-stopping and a Temporary Roof for sensitive materials protection whilst the project was ongoing. As the project was airside it required major planning in terms of logistics.

Call TONE now